Home
/
Petroleum
/
Details
Fuel depot installation license
Fuel depot installation license
Processing time
30
Within 30 days
Required documents for your application
First time application
-
A copy of construction permit issued by the competent Authority
-
A copy of land document
-
A copy of an environmental impact assessment certificate
-
A copy of the project feasibility Study
-
A copy of approved detailed drawings design complying with the Rwandan Building Code, National or International Standards on Petroleum infrastructures
-
Copy of Pre-consultation letter
Payable fee for the license
First time application
-
Application Fee
Free
-
License Fee
2,000,000
RWF
Copyright © 2026 Rwanda Utilities Regulatory Authority-Online Services. All rights reserved
*Gold Numbers:
Numbers with 4 repetitive digits (e.g 4444)
Number with 4 consecutive digits (e.g 3456)
***Bronze Numbers:
Numbers with any 2 repetitive digits ( 10 22 )
Numbers with any 3 consecutive digits ( 2 456)
**Silver Numbers:
Numbers with 3 repetitive digits (e.g 3444)
Numbers pairs (e.g 34 34, 22 55)
****Ordinary Numbers:
Numbers not falling in any of the above category or with random numbers