Home
/
Petroleum
/
Details
Petrol Service Station Installation License
Petrol Service Station Installation License
Processing time
21
Within 21 days
Terms and Conditions
Please review the terms and conditions before applying.
Download
Required documents for your application
First time application
-
A copy of construct permit issued by the competent Authority
-
A copy of land document (s)
-
A copy of an environment impact assessment certificate (EIA)
-
A copy of a site plan and detailed drawing designs
-
Copy of Pre-consultation letter
-
A clearance from the Competent Authority to use the road reserve as an access to the petrol station facilities where applicable
-
A copy of construct permit issued by the competent Authority
-
A copy of land document (s)
-
A copy of an environment impact assessment certificate (EIA)
-
A copy of a site plan and detailed drawing designs
Payable fee for the license
First time application
-
Application Fee
Free
-
License Fee
500,000
RWF
-
Application Fee
Free
-
License Fee
Free
Copyright © 2026 Rwanda Utilities Regulatory Authority-Online Services. All rights reserved
*Gold Numbers:
Numbers with 4 repetitive digits (e.g 4444)
Number with 4 consecutive digits (e.g 3456)
***Bronze Numbers:
Numbers with any 2 repetitive digits ( 10 22 )
Numbers with any 3 consecutive digits ( 2 456)
**Silver Numbers:
Numbers with 3 repetitive digits (e.g 3444)
Numbers pairs (e.g 34 34, 22 55)
****Ordinary Numbers:
Numbers not falling in any of the above category or with random numbers