Authorization For Fiber optic underground installation

Right of way authorization/foc installation(Underground )
License Validity
3
Months
Processing time
30
Within 30 days
Renewable
No
License Type
Authorization
Terms and Conditions
Please review the terms and conditions before applying.
Download
1
Required documents for your application
First time application
  • Application letter motivating the need of such facilities*
  • Scaled design in PDF indicating: (location shall be in GPS coordinates)
  • Drawing in shapefile/KMZ
  • Fibre Optic Cable Specification*
  • Overall Network Diagram and Design*
  • Copy of valid license*
2
Payable fee for the license
First time application
  • Application Fee Free
  • Permit Fee Free