Login Register Kiny Eng
Right of way authorization/foc installation(Underground )
Right of way authorization/foc installation(Underground )

Contact Email: alexis.rwililiza@rura.rw, Contact Phone: 0788577612

1
Required documents for your application
First time application:
  • Network diagram(s)
  • Design drawing(s)
  • Time plan for fiber rollout
  • Enclose copy of specifications
  • Application letter ( motivation)
  • Drawing of the Fibre route in Shapefile/KMZ/KML with legend as per the fibre data template
  • Drawing of Fibre route in pdf with legend as per the fibre data template.
  • Commitment letter
  • Copy of valid license In PDF
Renewal:
  • Network diagram(s)
  • Design drawing(s)
  • Time plan for fiber rollout
  • Enclose copy of specifications
  • Application letter ( motivation)
  • Drawing of the Fibre route in Shapefile/KMZ/KML with legend as per the fibre data template
  • Drawing of Fibre route in pdf with legend as per the fibre data template.
  • Commitment letter
2
Payable fee for the license
First time application:
  • Application Fee: Free
  • Permit Fee: Free
Renewal:
  • Application Fee: Free
  • Permit Fee: Free
3
License Validity
3
Month
4
Processing time
30
Within 30 days
Follow us on