Login Register Kiny Eng
Right of Way Authorization/foc Installation (Aerial)
right of way authorization

Contact Email: alexis.rwililiza@rura.rw, Contact Phone: 0788577612

1
Required documents for your application
First time application:
  • network diagram(s)
  • design drawing(s)
  • Time plan for fiber rollout
  • Enclose copy of specifications
  • Underground - Commitment letter
  • Overhead - Application letter
  • Overhead - Drawing of the Fibre route in Shapefile/KMZ/KML with legend as per the fibre data template
  • Overhead - Drawing of Fibre route in pdf with legend as per the fibre data template
  • Overhead - Agreement with pole owners e.g. EUCL for overhead
  • Overhead - Report of the joint survey between poles owner (EUCL) and the applicant
  • Copy of valid license In PDF
Renewal:
  • network diagram(s)
  • design drawing(s)
  • Time plan for fiber rollout
  • Enclose copy of specifications
  • Underground - Commitment letter
  • Overhead - Application letter
  • Overhead - Drawing of the Fibre route in Shapefile/KMZ/KML with legend as per the fibre data template
  • Overhead - Drawing of Fibre route in pdf with legend as per the fibre data template
  • Overhead - Agreement with pole owners e.g. EUCL for overhead
  • Overhead - Report of the joint survey between poles owner (EUCL) and the applicant
2
Payable fee for the license
First time application:
  • Application Fee: Free
  • Permit Fee: Free
Renewal:
  • Application Fee: Free
  • Permit Fee: Free
3
License Validity
3
Month
4
Processing time
30
Within 30 days
Follow us on